NYSTA EVSE DC Fast Chargers – Commercial Construction

Project Overview

Installation of Fast Charging Stations along the NYS Thruway System with Level 2 and Level 3 Charging Stations. Work including new electrical services to power charging stations. Level 2 Chargers take roughly 4 hours to charge. Level 3 Chargers are capable of 50-100Kw and charge in roughly 30 minutes.

Provided Electrical Engineering Design Services for 19 locations along the NYS thruway system with level 2 and 3 charging stations.

New charging stations help decarbonize the transportation sector, reduce statewide carbon emissions and encourage more drivers to utilize electric vehicles and public transportation. 

“Going Green” With the rise of electrical vehicle purchases the need for accessible charging stations has increased.”

Locations: Dewitt, Warner, Ontario, Port Byron, Angola
  • Exit 27 New Amsterdam
  • Exit 30 Herkimer
  • Exit 31 Utica
  • Exit 32 Westmoreland
  • Exit 33 Verona
  • Exit 34 Canasota
  • Exit 34A Collamer
  • Exit 36 Mattydale
  • Exit 38 Liverpool
  • Exit 43 Manchester (installed and operational)
  • Exit 48A Pembroke (installed and operational)
  • Exit 49 Depew

Installation of the dual-port Level 2 charging stations along the Thruway began in July and is scheduled to be completed and available for use by the fall. Each installation will support two electric vehicles charging simultaneously at about 7kW. On average, a Level 2 charging station will fully charge an EV battery in approximately 4 to 5 hours. Commuters can park their cars at the Park and Ride lot and return at the end of the workday to a fully charged car.

Project Name
NYSTA EVSE DC Fast Chargers

Project Type
Electrical Drawing Coordination Study Reviews

Industry
Commercial

Client
Hewitt Young Electric

Location
NYS Thruway, Various Locations

Size
19 Various Locations along the NYS Thruway

Company Bio
Electrical Charging Stations

Project Engineer
Eric Strassner, PE